USA flag. Handcrafted in USA
Black Stack Pipe, 5" Diameter x 24" Length

PRICE$20.00

5

Black Stack Pipe, 5" Diameter x 24" Length

SKU: IM-BM0110
Black Stack Pipe
PRICE

$20.00

AVG, SHIPPING TIME

Timing is based on our current production timeline.

Unparalleled Support

Distributed by Smoky Lake

Your Partner in Maple

Tested and Approved

Premium Maple Equipment

Description

  • Thickness: 24 gauge
  • Finish: Pre-painted satin black
  • Material: Steel construction
  • Assembly Method: Snap lock
  • Brand: Imperial
  • Maximum Temperature: 800ºF
  • Minimum Clearance To Combustible Materials: 18″
  • FAQ and Tips (Link will take you to the manufacturer’s website)

INSTALLATION

  • Snap together the side seam of the pipe.
  • The crimped male end of the pipe should be oriented downward toward the arch.
  • Fit the male end into the female end of another 5″ pipe.
  • Stack Pipe should always be secured/supported. The pipe manufacturer recommends using a minimum of 3 sheet metal screws to secure each connection. Then support the installed pipes using a guy support.
  • At the end of the season, store your evaporator and stack pipe indoors to protect the longevity.

WARNINGS

  • Pipe is HOT during and after operation. DON’T TOUCH!
  • The minimum clearance to combustible materials is 18″.
  • Stack pipe should always be supported/secured.

Tutorials and Tips

5

Black Stack Pipe, 5" Diameter x 24" Length

SKU: IM-BM0110
PRICE

$20.00

AVG, SHIPPING TIME

Timing is based on our current production timeline.

5″ diameter Black Stack Pipe is used on the 16″ x 30″ Gas-Fired Finisher Evaporator. It’s a durable 24 gauge steel construction, and pre-painted a satin finish black. Easy snap-together assembly. The crimped male end fits to other round pipe of the same diameter.

Manufacturer Instruction Guide
Average Shipping time
car
Free Shipping for Continental US

Description

  • Thickness: 24 gauge
  • Finish: Pre-painted satin black
  • Material: Steel construction
  • Assembly Method: Snap lock
  • Brand: Imperial
  • Maximum Temperature: 800ºF
  • Minimum Clearance To Combustible Materials: 18″
  • FAQ and Tips (Link will take you to the manufacturer’s website)

INSTALLATION

  • Snap together the side seam of the pipe.
  • The crimped male end of the pipe should be oriented downward toward the arch.
  • Fit the male end into the female end of another 5″ pipe.
  • Stack Pipe should always be secured/supported. The pipe manufacturer recommends using a minimum of 3 sheet metal screws to secure each connection. Then support the installed pipes using a guy support.
  • At the end of the season, store your evaporator and stack pipe indoors to protect the longevity.

WARNINGS

  • Pipe is HOT during and after operation. DON’T TOUCH!
  • The minimum clearance to combustible materials is 18″.
  • Stack pipe should always be supported/secured.

Tutorials and Tips

There are no reviews yet.

Overall rating

five × 5 =

Tutorials and Tips

Take advantage of our online resource library, 24/7. You’ll find illustrated instruction guides, videos, and a full range of maple topics!